| Entrance covering of the metro station "VYRLUTSA". The last edition of the project with the using of the cell polycarbonate. Project Institute UKRMETROTUNNELPROJECT Kyiv 2006 | ![]() |
| Entrance covering of the metro station "PALATS SPORTU". ANKOR company assembled constructions and mounted polycarbonate slabs almost during two weeks. Unfortunately metropolitan service cooperated with them only before the EUROVISION contest. Project Institute UKRMETROTUNNELPROJECT Kyiv 2005 | ![]() |
| Realization of the ceiling in the entrance hall of the metro station "POLYTECHNIC INSTITUTE". It was primarily given in the sound-absorbing material ECOPHONE,the project was processed and made from the LUXALON aluminum by AMTP(CON-REN). Project Institute UKRMETROTUNNELPROJECT Kyiv 2003 | ![]() |